The first three-level interchange in Uzbekistan at the intersection of Akhangaran Highway and Makhtumkuli Street was opened on May 20, 2020. At the lower level of the bridge (Parkentskaya — Akhangaran highway) there is a 6-lane tunnel with a length of 502 meters, a width of 26.7 meters and a height of 5.5 meters. The second level of the interchange is a 3-lane circle with a diameter of 329.2 meters. The third level with a length of 593 meters stretches from Makhtumkuli Street to a new road in th
Parkent street